Bored Pile Construction

Bored Pile belongs to the non-displacement pile group. This method involves drilling by a mechanical spiral plate or bucket auger. This method is suitable for hard stratum or complex soil conditions. Bored Pile also causes less noise pollution compared to Drive Pile works.

PT INSEMA SUNLY ENGINEERING has formulated and improvised reverse and double casing method that increase efficiency and reduce cost.

Bored Pile Construction Gallery

Click thumbnails to view larger images

  • bored pile

    Bored Pile Construction

  • bored pile

    Bored Pile Indonesia

  • bored pile

    Preparatory Work

  • bored pile

    Bored Pile Method

What are the Advantages of Bored Pile?

  • 1 Low noise and vibration while execution of drilling and thus does not cause damages to adjacent building or affect surroundings by causing noise pollution.
  • 2 Large dimension of pile is applicable to meet the design requirements
  • 3 Fast and efficient to execute with our latest equipments
  • 4 Suitable for hard stratum or complex soil conditions.